Third Version’s a Charm: MAPNA Group’s MGT-70(3) marks anniversary of its operation
Third Version’s a Charm: MAPNA Group’s MGT-70(3) marks anniversary of its operation
2021/01/07

June 2020 is the third anniversary of launching MAP2B, MAPNA Group’s homegrown gas turbine which was a turning point in independent design and manufacture of gas turbines in the company. Aiming to boost the performance of E-class V94.2 turbines, the largest fleet operating in Iran’s power sector, the project inaugurated in 2011 and was carried out in three phases in six years. MAP2B was the fruit of the third phase.