F9-E (PG9171E)


In ISO conditions this turbine has an output of 123 MW. Here at PARTO we produce all the blades and vanes of this turbine via reverse engineering
  • Type: F9 - First Stage Bucket
  • Material:
  • Weight: 12(kg)
  • coating: Yes
  • cooling: Yes
  • Number: 92
  • Type: F9 - Second Stage Bucket
  • Material:
  • Weight: 12.5(kg)
  • coating: Yes
  • cooling: Yes
  • Number: 92
  • Type: F9 - Third Stage Bucket
  • Material:
  • Weight: 11.5(kg)
  • coating: No
  • cooling: NO
  • Number: 92
  • Type: F9 - First Stage Nozzle
  • Material:
  • Weight: 41(kg)
  • coating: No
  • cooling: Yes
  • Number: 18
  • Type: F9 - Second Stage Bucket
  • Material:
  • Weight: 114(kg)
  • coating: Yes
  • cooling: Yes
  • Number: 16
  • Type: F9 - Third Stage Nozzle
  • Material:
  • Weight: 140(kg)
  • coating: No
  • cooling: NO
  • Number: 16

Related Service

Related Ability